Industry Notes

Industry Notes / Solar / Chapter 12 of 12 · Side-by-side

Three escapes from commoditization

Storage shift, overseas walls, asset ownership—already walked

What is still unclear?

Write what you still want explained. Questions go to the author and are not shown publicly.

Paths

  • ① Storage/systems: sell certainty; margins multiples of selling watts
  • ② Localized capacity: Mid-East neutrality for local + Europe
  • ③ Generation/utility: value stays in power assets (NextEra type)

Read for LONGi

  • Slowest storage move among the five majors
  • BC seeks premium while still “selling watts”
  • Mature tandems may relocate the c-Si efficiency war
  • Watch: tandem roadmap + GCL 1 GW real shipments and fade

Canadian Solar’s same 10-K: storage gross 28.6% vs modules 5.33%. Mid-East plants buy geopolitical neutrality, not SE-Asia tariff hops. LONGi fights BC inside modules while peers change maps.

Source:阿特斯 2025 年报分部;CPIA 海外产能;调研正文第 16 章三条逃离路径